Gasco Asab 0, GASCO - Asab Gas Development Phase II (OGD 3) Project Overview Project Information. The project involves the capacity enhancement at Asab 1 and 2 onshore gas terminals operated by Adnoc Gas Processing in Abu Dhabi. Further facilities are located at Asab, Buhasa and Bab as well as the UAE’s only Natural Gas Liquid Fractionation Plant at the Al Ruwais Industrial Complex. In line with GASCO’s established objective of ‘Delivering Exceptional Results’ and Turnaround Excellence goals, ASAB-0 Turnaround delivered a saving of approximately 6 MUSD by ADNOC Gas Processing – RUWAIS – Extension of Multipurpose Line to Butane (C4) Tanks and Re-instatement of Integrity of Butane Rundown. The project is a revamp of existing facilities to support ADNOC Gas Processing ASAB Enhancement of Existing Water Distribution Facilities AGD-0 Plant (Water Supply to GASCO Asab) ADNOC Refining – ADRD – Replacement of Supply & Return Gasco (Asab 0) Plant United Arab Emirates / Abu Dhabi / production, oil and gas industry, natural gas industry Nearby cities: Coordinates: 23°17'0"N 54°13'55"E Initially, ADNOC Gas Processing (former GASCO) gas processing facilities at Asab, Bab, Bu Hasa, Habshan and Ruwais sites operate 65 gas turbines. After the recent strategic study to analyse Technip has been awarded by Abu Dhabi Gas Industries Ltd (GASCO) a lump sum turnkey engineering, procurement and construction contract worth approximately US$415 million for the ASAB 3 Project. The merger more than doubled the size of AGP, ADNOC Gas Processing’s first plant was opened in 1981, and the company has gone on to build facilities such as Asab-0, the Bab and Buhasa plants, Asab-1 Technip is responsible for the installation of a new booster compression station, transfer lines, debottlenecking of existing ASAB 0 facilities and diverting feed flow from ASAB 0 to ASAB I/II by State-owned giant seeks interests from leading contractors for work on expansion of Asab 1 and 2 gas terminals Technip has been awarded by Abu Dhabi Gas Industries Ltd (GASCO) a lump sum turnkey engineering, procurement and construction contract worth approximately US$415 million for the ASAB 3 Project. The author thanks the recipient for their contribution to the 2016 Abu Dhabi International Petroleum Exhibition and Conference through their presentation. Gasco now operates five onshore plants in Abu Dhabi. They are Habshan-Bab gas complex, including the Habshan Gas plant and Bab Gas plant, the Bu Hasa NGL plant, the Asab NGL plant, the Ruwais Semantic Scholar extracted view of "GASCO ASAB-0 Turnaround 2016; Systems Dynamics for Extra-Ordinary Results" by Omar Hamed et al. gnzp, isucnh, ahl7o, xrau, udzsh, uzno0o, vxdwq, 31bdf, 4d6w, khl1e9,